Homepage  |   Favorite   |   中文版                                  
Home page | Company profile | Product display | News Center | Organi zation | Plant equipment | Company philosophy | Manpower recruitment | Single system | Customer message | Contact Us | |
About Us
   
 
  Liquid pressure cylinde-
           r series
  Liquid booster series
  Gas booster series
  Press \ pressure punch
           series
  Solenoid valve \ pneuma-
           tic accessories series
  Times of Cylinder
  Other Products
 
 
Contact:Mr.Deng 18929104529
Mr.Zhou 18929169595
Miss Zhang 18929104530
Toll Free: 4000661106
Tel: 076921664818 (16 lines)
Fax: 076921664685
E-mail: ybl_kj@163.com
Website:http://www.dgybl.com
Address: Dongguan City Wanjiang Dafen Industrial Zone sand Kiln Lane 31, Lane ten
 
                     News Center
Pressure machinery used correctly
Improper operation or stamping mould Settings press press of damage and stop in the first place. Proper training and stamping mould setting machine operators can ensure them with the correct procedure. This will reduce downtime.
Before each operation to manipulate the point, stem axis brake fill lube oil first day before the ball 20-30 gun raises JiXieYou moderate, clutch parts/day in oil gun pressure oil note. Before each downtime for machine cleaned.
Check all fasteners, external missing parts. Check the clutch and spring, belt. Check the lubrication device machine. Check the electrical wiring breakage, aging, motor and electromagnets are normal. Check the crankshaft guide precision and wear. Check brake and clutch, slider, closed blocks, closed loop. Check electric controlling part. Fuselage table bolt and adjustment.
According to the different types and processing machine press, formulate targeted and feasible for safe operation, and the necessary job training and safety education. Use the unit and the operator must strictly abide by the safety design manufacturing units provide instructions and procedures, correctly use and maintenance. General safety operation requirements press are as follows:
Before the equipment, to check the press brake and clutch parts, manipulation, whether in effective safety protection device is complete with a slider-crank mechanism, each have abnormalities. Abnormal shall promptly adopt necessary measures, and shall strictly perform operation, remove and damage to the safety device. Formal operation prior trial, confirm the part idling normal. Before starting work should be clear on all unnecessary items, prevent fall wounded or driving vibration caused by sudden impact switch slider. Operation must use tools, forbidden by hand directly into the mold, hand take with mouth shall not put on the mould tools.
In KouOu mode adjust position or take off in mould parts, must leave foot pedals. People have the same platform press operation unified command, signal, each other clearly, and clearly identified from danger to action. Suddenly power or after operation, and will be shut off the power to control device, brake in braking clutch shot. Repair, adjust to press in the installation, adjustment and remove mould, should, in machine disconnect sources such as electricity, gas, liquid), machine stop operation conditions, and under the slider to add put cushion block supporting reliable. Machine start switch places listing notices warning.
This article reprinted http://www.dgybl.com from (the),
【 Views:851 】 【 add time:2010-8-14 9:18:34 】 【 close

Copyright:Yalyce (DongGuan) Hydraulic Equipment Technology CO., Ltd Support:TXJNET 粤ICP备10081236号
Site Keywords:Liquid-drived Upower,Liquid-drived Booster,Pneumatic Press,Multiplier Air-Cylinder,Power Cylinder,half-arch