Homepage  |   Favorite   |   中文版                                  
Home page | Company profile | Product display | News Center | Organi zation | Plant equipment | Company philosophy | Manpower recruitment | Single system | Customer message | Contact Us | |
About Us
   
 
  Liquid pressure cylinde-
           r series
  Liquid booster series
  Gas booster series
  Press \ pressure punch
           series
  Solenoid valve \ pneuma-
           tic accessories series
  Times of Cylinder
  Other Products
 
 
Contact:Mr.Deng 18929104529
Mr.Zhou 18929169595
Miss Zhang 18929104530
Toll Free: 4000661106
Tel: 076921664818 (16 lines)
Fax: 076921664685
E-mail: ybl_kj@163.com
Website:http://www.dgybl.com
Address: Dongguan City Wanjiang Dafen Industrial Zone sand Kiln Lane 31, Lane ten
 
                     News Center
Pressure machinery maintenance
Safety during maintenance:
To ensure proper locking / opening process to ensure the safety of maintenance staff to ensure that the conduct of brake maintenance trip before the bottom of the sleeve placed. If you do, do not need to lock the sleeve on the.
For press operators to maintain the process to
To press operators to maintain the course of the press to make them when problems arise at any time to remind the maintenance or management. They carried out daily press operations, and therefore easier to hear or see signs of problems. As a daily driver with a car, you can note the first time an unusual sound, which is the same for the operator.
Environmental control workshop:
Make a clean press operator or maintenance personnel can quickly discover when problems occur. Such as oil spills, leakage, breakage, etc., if the press is clean, it can be very simple to find out the location.
Electrical work will be left to the professionals to solve related
Only qualified electrical technicians to electrical line maintenance for the press, but you can still check the press on the control panel is normal light bulb of each class should ensure that the light bulb in the work and carried out correctly display all the press kinds of operating conditions.
Ensure that the press is in the position of equilibrium:
Press can be a delicate balance and better work, so the best once a year inspection. Pneumatic system charged with pneumatic brakes and balance of system operation, need to check whether there are gas leaks, because the Department of the appropriate brake and air pressure can affect the balance of system performance, and they control the press stop time, if there are problems will make operation and equipment in danger. In addition, all the pneumatic systems have regulators, lubricators and reservoirs. Accumulation in the gas pipeline in the water, should be ruled out every day.
Time to replace oil and filter:
Lubrication system on the press also took place undue maintenance shutdown of one of the main press, for some reason, many press operators with a filter in the loop with the system in operation from time to time to replace oil filter. Should ensure that their oil changed at the same time in replacement of filters, usually also need frequent replacement.
Mechanical press to maintain the key:
A mechanical press for routine maintenance projects, where the most important? The answer is the operator. All maintenance and issue press search to start at the operator, the operator presses often can discover problems early to prevent parts of the press produced a significant, sustained damage. The operator can press attention given by the strange sound; any abnormal temperature, smoke, some portion of the debris or metal particles; and pipeline leakage problems found. Operators should ask ourselves every day problems, by checking the answer after the recording, so as to maintain long-term maintenance of records.
(This article reproduced from http://www.dgybl.com)
【 Views:800 】 【 add time:2010-8-16 9:19:39 】 【 close

Copyright:Yalyce (DongGuan) Hydraulic Equipment Technology CO., Ltd Support:TXJNET 粤ICP备10081236号
Site Keywords:Liquid-drived Upower,Liquid-drived Booster,Pneumatic Press,Multiplier Air-Cylinder,Power Cylinder,half-arch